Jian Chen Mould

Sample figures — awaiting owner confirmation

Every tool we cut starts with a flow analysis and ends with a dimensional report. Below are the tool families we build, with the numbers a technical buyer actually asks for.

300 sets / yr

Tools delivered

Across five processes

4 weeks

Fastest T1

Single-cavity tool

0.005 mm

Grinding capability

Wire-EDM and jig-grind

100 M strokes

Best demonstrated die life

Carbide wear parts

Tool families

Filter by process or by the market the part goes into.

Process
Industry

6 tool families

Compare tooling

Compare tooling
Process
Cavities
Tool steel
Tool life
Cycle time
Tolerance
Stations
Stroke rate
Clamping force
Container size
Cure time
Base material
Locators
Repeatability
Cycle
Lead time

Up to three tool families at a time.

Injection moulds

Multi-cavity injection mould

Balanced runner tools for high-volume technical parts, from 1 to 64 cavities.

Cavities
1 – 64
Tool steel
718H / NAK80 / S136
Tool life
Up to 1,000,000 shots
Cycle time
18 – 45 s
Tolerance
±0.02 mm on fits
  • Automotive
  • Appliance
  • Electronics
  • Medical
  • Packaging
Show full specification
Multi-cavity injection mould: Full specification
Mould base LKM / DME / HASCO standard
Hardness Pre-hard 30–38 HRC; hardened cavity 48–52 HRC
Hot runner YUDO / Synventix / valve-gate needle
Gate types Tab, pin-point, submarine, valve-gate
Cooling Conformal lines, beryllium inserts, dual-circuit TMU
Venting Deep-groove and vacuum venting
Ejection Sleeve, blade, air-blow, unscrew
Surface finish SPI A1–A3, VDI 27#, texture
Press range 90 – 1,600 tonne
Sampling T1 parts with full dimensional report
Lead time to T1 4 – 6 weeks

Typical parts

  • Interior clips, bezels and housings
  • Appliance panels and control knobs
  • Connectors and housings
  • Syringe barrels, caps, micro-fluidic parts
  • Closures and thin-wall containers

How we approach it

  • Flow balance is signed off on the 3D before steel is cut, with gate position locked only after a fill/pack/warp report.
  • Cavity and core are machined as matched pairs on one setup so parting lines stay closed after 500,000 cycles.
  • Wear plates and inserts are hardened and ground separately, so a production change is an insert swap, not a new tool.
Quote this tooling

Progressive dies

Progressive stamping die

4 to 30-station dies for strip parts, running to 500 strokes per minute.

Stations
4 – 30
Tool steel
SKD11 / DC53 / carbide
Tool life
3M – 100M strokes
Stroke rate
60 – 500 spm
Tolerance
±0.01 mm
  • Automotive
  • Electronics
  • Appliance
  • Industrial
Show full specification
Progressive stamping die: Full specification
Strip thickness 0.1 – 6.0 mm
Guide posts Six-post die set, bush-refreshable
Punches & dies Carbide where wear or burr height demands it
Stripping Spring, urethane or urethane-pad cushion
Feeding Roll feed, straightener, sensor misfeed stop
Machining route Wire-EDM, CNC grind, jig-bore, hand-fit
Clearance control Step-and-pierce gaps held to 0.005 mm
Press range 60 – 300 tonne
Lead time to T1 6 – 8 weeks

Typical parts

  • Terminal and connector stampings
  • Motor laminations, stator and rotor cores
  • EMI shield cans
  • Springs, contacts and leaf clips
  • Bracket and lead-frame parts

How we approach it

  • The strip layout is reviewed for carryover, tonnage and pilot-pin engagement before the die book is released.
  • Every pierce and form station is shim-adjustable, so press wear is compensated by grinding a plate, not scrapping the die.
  • Burrs and springback are measured per station at T1, and the corrective station is identified before any steel is removed.
Quote this tooling

Die-casting tools

Die-casting tooling

Vacuum and high-integrity dies for structural aluminium parts up to 3,500 tonnes clamping.

Cavities
1 – 8
Tool steel
H13 / SKD61 / 1.2343
Tool life
80k – 300k shots
Clamping force
160 – 3,500 tonne
Tolerance
ISO 8 class, ±0.05 mm
  • Automotive
  • Industrial
  • Electronics
Show full specification
Die-casting tooling: Full specification
Heat treatment Vacuum hardened 46–50 HRC, tempering cycle
Gating Rotary/slow shot, vacuum assist, changeable ingate
Thermal management Insert-based hot spots, TMU circuits, baffles, shields
Spraying Robot spray with release dosing records
Machined inserts CNC-machined inserts, no welding on high-stress zones
Cooling technology High-pressure water, foam, beryllium sleeves
Trim die Matched trim and pierce die supplied with the tool
Porosity control X-ray or section check to agreed defect class
Lead time to T1 8 – 10 weeks

Typical parts

  • Battery-tray frames and cross members
  • Motor and reducer housings
  • Bracket and seat structural parts
  • Housing for e-mobility inverters
  • Compressor and pump bodies

How we approach it

  • Solidification and filling are simulated with the actual machine curve, so the overfill and biscuit size are designed in rather than found at trial.
  • Thermal fatigue is the failure mode, so hot-zone inserts are made replaceable and the cooling circuit layout is documented for the owner.
  • Die-sinking is done in-house so electrode wear and corner radii are corrected the same day.
Quote this tooling

Blow & extrusion

Blow moulding & extrusion dies

Single to 8-cavity stretch-blow, extrusion-blow and profile head tooling for hollow parts.

Cavities
1 – 8
Tool steel
P20 / 6061 / H13 head
Tool life
300k – 800k bottles
Container size
20 ml – 25 L
Tolerance
±0.1 mm wall, ±0.15 mm height
  • Packaging
  • Appliance
  • Automotive
  • Industrial
Show full specification
Blow moulding & extrusion dies: Full specification
Processes Extrusion blow, stretch-blow, overmould handle
Head type Accumulator head or continuous extrusion head
Parison control Programmed wall thickness, servo die ring
Neck finish Toleranced thread and sealing face, gauged 100%
Flash knife Knife edges hardened and lapped
Machine range 90 – 450 tonne blow moulding
Stack moulding Available for small-volume closures
Lead time to T1 5 – 7 weeks

Typical parts

  • Oil, coolant and detergent bottles
  • Hollow handles and armrests
  • Tubes, profiles and seals
  • Fuel tanks and ducting
  • Medical reservoirs

How we approach it

  • Wall distribution is designed with parison programming curves supplied as part of the tool package, so the moulder starts from a documented setting.
  • Neck gauging is treated as the critical feature; thread and sealing faces are checked against a master every 20 cavities.
Quote this tooling

Rubber & LSR

Rubber & liquid-silicone moulds

Compression, transfer and LSR injection tools for seals, buttons and medical parts.

Cavities
1 – 48
Tool steel
S136 / 6061 / SKD61
Tool life
50k – 200k cycles
Cure time
30 s – 8 min
Tolerance
ISO 3601 / S–M class
  • Automotive
  • Medical
  • Appliance
  • Industrial
Show full specification
Rubber & liquid-silicone moulds: Full specification
Processes Compression, transfer, LSR injection
Press range 40 – 630 tonne
Feed system Sprue, runner and trim land calculated by volume
Surface Blast, polish or PTFE coat for release
Medical grade Cleanroom-ready finish and documentation
Insert overmoulding Metal and ceramic inserts located by hardened nest
Lead time to T1 3 – 5 weeks

Typical parts

  • O-rings, grommets and oil seals
  • Keypad and membrane buttons
  • Sealing strips and connector boots
  • Medical tubing fittings and stoppers
  • Vibration mounts

How we approach it

  • Shrinkage is set per compound and per direction, with the value recorded on the drawing so a re-order matches the first order.
  • Flash land geometry is standardised so trim tooling and the compression tool never disagree.
Quote this tooling

Gauges & fixtures

Checking gauges & work-holding fixtures

Body-panel gauges, weld fixtures and CNC work-holding built from the same datum scheme as the tool.

Base material
6061 T6 / steel frame / resin check face
Locators
GD&T datum nest, magnet clamp, cam
Repeatability
±0.02 mm
Cycle
30 – 120 s
Lead time
3 – 5 weeks
  • Automotive
  • Appliance
  • Industrial
Show full specification
Checking gauges & work-holding fixtures: Full specification
Design source 3D master model with datum feature report
Check surfaces Machined or cast resin faces, 0.01 mm ground where gauged
Sensor ready Prepared for LVDT or contactless probe mounting
Certification CMM-certified with traceable report
Weld fixtures Clamps, cylinders and positioner duty considered
Machining fixtures 3R / ERA or custom tower with datum blocks
Version control Etched part number and revision on the body

Typical parts

  • Body-side and hood panel gauges
  • Weld and rivet location fixtures
  • Assembly and function gauges
  • 5-axis machining work-holding
  • Deburr and inspection benches

How we approach it

  • The gauge and the mould are modelled in one file, so a datum dispute cannot be settled twice with two different answers.
  • Wear points are replaceable and spares are listed on the delivery document.
Quote this tooling

Development process

Eight gates from drawing to handover. Each one leaves you a document you keep.

  • Requirement review

    Drawing, material, annual volume and your machine list are read together; the first quote therefore includes gate position and parting line, not just a price.

    Deliverable DFM report, 3 pages

  • Flow simulation

    Fill, pack, warp and cooling are run on the proposed cavity count, and the two or three options worth arguing about are put in front of you.

    Deliverable Moldflow / MAGMASOFT report

  • Tool design release

    2D tooling drawing plus 3D, with the change list closed before the die book is released for machining.

    Deliverable Approved die book

  • Machining

    Milling, boring, EDM and wire run from the same model; critical dimensions are measured between operations, not only at the end.

    Deliverable In-process CMM records

  • Fit-up and benching

    Hand-fit of parting faces, action and ejection, checked on the bench before the tool ever sees a press.

    Deliverable Bench-approval photos

  • T1 trial

    Trial on the stated machine class with the agreed material, and every dimension on the drawing measured on the resulting parts.

    Deliverable T1 parts + full dimensional report

  • Modify and validate

    Changes are made against the report, and T2 confirms the corrected features before sign-off.

    Deliverable Change log + T2 report

  • Handover or production

    The tool can ship with its documentation pack, or stay and run your parts with a recorded maintenance history.

    Deliverable Tool pack, spares list, PPAP/ISIR

Equipment & materials

Where the tolerance claims come from: the machines, the steel we keep in stock, and the paperwork that travels with the tool.

Machinery

CNC machining centres
3-axis and 5-axis, up to 1,600 × 800 × 800 mm
Wire EDM
Dual-head, ±0.003 mm on through cuts
Sinker EDM
Graphite electrodes machined in-house
Precision grinding
Surface, jig and coordinate grinding
CMM
Bridge and portable arm, scanned reporting
Trial presses
Injection 90 – 650 t, presses 110 – 300 t

Software

  • NX (UG)
  • PowerMill
  • Moldflow
  • MAGMASOFT
  • AutoCAD
  • PC-DMIS / Calypso

Tool steels

Tool steels
Grade Hardness Typical use
P20 28 – 32 HRC Pre-hard bases, blow moulds
718H 33 – 37 HRC Cavities and cores, polished
NAK80 38 – 42 HRC Mirror optics and texturing
S136 48 – 52 HRC Corrosion-resistant, medical
H13 / SKD61 46 – 50 HRC Die casting, thermal fatigue
SKD11 / DC53 58 – 62 HRC Punches and die buttons
Carbide 89 – 92 HRA High-wear stations

Inspection & documentation

  • Material certificates per block
  • Heat-treatment reports
  • Full dimensional FAI at T1
  • PPAP / ISIR documentation
  • Surface roughness and hardness checks
  • Tool maintenance log handed over

Frequently asked questions

What do you need to quote a tool?

A 3D model (STEP) or a 2D drawing with tolerances, the plastic or strip material, expected annual volume and, if you have one, your press or machine specification. With those four we can quote a cavity count, a tool price and a T1 date.

How long until we see DFM feedback?

Three to five working days for a normal tool, and it arrives as a marked-up document with the questions we need answered — not a silent quote.

How many trials are included?

T1 plus one corrective round is included in the tool price. A second is rare and always quoted before any steel is removed.

Who owns the tool, and can we move it?

You do, once paid. Tools are etched with your part number, stored under an NDA, and shipped with the design records, spare-part list and maintenance log so a transfer is a document handover, not a rebuild.

Do you also run production?

Yes. Many customers keep the tool here for moulding; the same tool then carries a shot count and maintenance record, which is what makes a later transfer, or a re-order, predictable.

What happens at end of tool life?

We quote a refurbishment scope first — inserts, gates, slides and polished faces are normally replaceable — and only recommend a new tool when the base has moved.

Request a quote

Send drawings, a part number or a description of the component you need. We reply with a quotation, lead time and tooling assessment — usually within one business day.

Request a quote

Send drawings, a part number or a description of the component you need. We reply with a quotation, lead time and tooling assessment — usually within one business day.

Your details are used only to answer this inquiry. We do not share them with third parties and we do not add you to a mailing list.

Request a quote — Contact